Although the job was slated to be “two and a half” days and it has now been three full days, they’ll be back in the morning for a few more things. Polishing the bathroom floor, gluing the rubber strip down on the doorsill, and driving me insane.
One of the guys did put the toilet back on for me, for 30 bucks. What a great scam. And, I have to hit the hardware store for some silicone to put the new kitchen sink in. The old kitchen sink remains on my porch, so I guess my request that they dispose of it was a waste of breath. Into the trash can it goes. I think it’ll fit.
In good news, it looks nice. The tile is not nearly as dark as I had feared, and now I’m trying to figure out when we should get the backsplash done in the kitchen. At least that won’t require gutting two rooms of the house for a week. Time to pull the fridge stuff out of the coolers and pretend I’m a grownup again. Joy.